WHETHER FREIGHT COST WILL BE ADDED TO COAL COST FOR VALUATION OF FUEL-IN TRANSIT IN CASE OF A THERMAL POWER STATION?

A THERMAL POWER STATION HAS CERTA COAL TRANSIT AS ON 31.03.2006. WHETHER IT SHOULD CLUDE THE FREIGHT COST COAL VALUE TO FD OUT THE VALUE OF FUEL- -TRANSIT VIEW OF THE FACT THAT RAILWAY FREIGHT IS PAID ON RECEIVED BASIS AND IT IS POSSIBLE THAT THE COAL TRANSIT IS NOT RECEIVED BY THE STATION, IT BEG BECOMG MISSG WAGONS.
THE COMPANY IS PAYG ADVANCE FREIGHT ON ADHOC BASIS TO RAILWAYS AND IT IS BEG SHOWN AS ADVANCE TO RAILWAYS.
WILL THE VENTORY VALUATION BE PROPER IF FREIGHT COST IS NOT CLUDED THE VALUE OF FUEL TRANSIT LIGHT OS AS-2
'